Takeoff, estimate and a client-ready proposal for concrete subcontractors, priced on your crew’s rates and your supplier’s numbers.
Most small commercial bids back in 3 business days. You review and approve every number.
Estimating eats nights and weekends, and a rushed number can cost you a job or your margin. Upload the plans and get a complete, checked bid back.
Everything goes through one upload form, and every bid follows the same routine.
Labor rates, supplier pricing and markup, entered on the form the first time you bid with us.
Add the plan set and project details. We confirm price and delivery date within one business day.
Takeoff, estimate and proposal, checked by someone who has run concrete crews.
A short walkthrough of the number, plus one round of changes.
The bid goes out under your company name. You own it.
The same four pieces on every job, from a driveway to a 50,000 SF slab.
Flat price per bid, quoted before we start. Rush delivery within 48 hours is 1.5× the standard price.
| Job size | Turnaround | Price |
|---|---|---|
| Residential flatworkDriveways, patios, walks | 48 hours | $150 |
| Small commercialUnder 10,000 SF slab, simple foundations | 3 business days | $350 |
| Mid commercial10,000–50,000 SF, footings, walls, site concrete | 5 business days | $850 |
| Large or structural50,000+ SF, elevated decks, multiple buildings | Quoted per job | From $1,700 |
| Plan | Per month |
|---|---|
| Builder15 residential bids | $950 |
| Starter4 small commercial bids | $1,200 |
| Pro8 small commercial bids | $2,375 |
| Addendum update | $75–150 |
| Change order pricing | $125 |
| Supplier quote gathering | $100 |
| Value engineering options | From $150 |
| Bid leveling for GCs | From $250 |
Unused monthly bids don’t roll over. Larger jobs count as two or three bids. Setup is free on monthly plans and $150 otherwise.
Upload plans for a job you’ve already priced or won. We’ll bid it free, and you can compare our number to yours.
If yours isn’t here, email us.
Yours. You enter your labor rates, supplier pricing and markup on the upload form, and every bid is priced from them. We don’t guess at your costs.
Upload them on the Start a bid page. PDFs up to 50 MB each. For larger plan sets, paste a Google Drive or Dropbox link in the notes.
You are. We build and check the bid, walk you through it, and make changes. You approve the final number before it goes out under your company name.
Slabs on grade, flatwork, footings, foundation and stem walls, and site concrete. Larger structural jobs are quoted case by case.
Per-bid work is invoiced on delivery. Monthly plans are billed at the start of each month. We accept card and bank transfer.
Only if you ask. By default everything comes to you and you submit the bid.